- PDCA (plan-do-check-act) is an iterative four-step problem-solving process typically used in business process improvement. It is also known as the Deming circle, Shewhart cycle, Deming cycle, Deming wheel, or plan-do-study-act.
- PDCA is a cycle of activities (Plan, Do, Check, Act) designed to drive continuous improvement. Initially implemented in manufacturing, it has broad applicability in business. First developed by Walter Shewhart, it was popularized by Edwards Deming.
- A concept used in the continuous improvement of work processes based on a four-step cycle: Plan-Do-Check-Act. The concept was originally used in industrial production management and quality management, but it is currently applied to work processes in general. ...
- A general problem solving methodology representing the steps: plan, do, check, and act.
- PLAN: Senior management should use the visioning process in the context of it Business Plan. HP translates the Business Plans to action plans, meaningful to all levels of the organization. ...
- Quality Assurance cycle! Plan the product, Do the manufacture, Check that the result is good and meets all standards set especially including customer satisfaction, Act on any need to upgrade manufacture or design and then go back to the start and do it again and again......
- Plan, Do, Check and Act. A cycle developed to carry out change in an organized manner as well as follow up and make adjustments as required in order to optimize use of resources and maximize results. This is another process with North American origins.
- Plan - Do - Check - Act
- (aka the Deming Cycle, Shewhart cycle, or Deming Wheel) is an iterative four-step quality control strategy. Walter Andrew Shewhart (March 18, 1891 - March 11, 1967) was a physicist, engineer and statistician, sometimes known as the father of statistical quality control. ... ...